自从1998年的洪水过后,国家对长江大题的堤防加固投入了大量的资金。抛石护岸是长江大堤加固的一项重大工程。施工过程中,我们精心研究,反复探讨,编制了一套施工控制程序,取得了良好的施工效果。1 施工程序安排水下抛石施工遵循以下施工程序:测量放样→水下地形复
Since the flood of 1998, the state has invested a large sum of money in strengthening the levees of the Yangtze River theme. Rock revetment is a major project to reinforce the Yangtze River embankment. During the construction process, we carefully studied and studied repeatedly and compiled a set of construction control procedures and achieved good construction results. 1 Construction Procedures Arrangements for underwater riprap construction follow the following construction procedures: measurement lofting → underwater terrain complex