论文部分内容阅读
为解决一矿选煤厂生产能力下降、设备磨损老化严重、介质消耗高的问题,对重介系统进行改造。通过更换两产品旋流器、旋流器入料泵,更换、增加脱介筛,更换磁选机等措施,全厂生产能力有效提高。
In order to solve the problem that the production capacity of Yiligang Coal Preparation Plant is declining, the wear and tear of equipment is serious and the medium consumption is high, the Dense Medium System is reformed. Through the replacement of two product cyclone, hydrocyclone feed pump, replacement, increase the sieve removal, replacement of magnetic separator and other measures, the entire plant production capacity effectively improved.