论文部分内容阅读
目的:开展品管圈活动,降低静脉输液药品配制前的缺陷率,提高工作质量,保证用药安全。方法:组建品管圈,分析造成静脉输液药品配制前缺陷的原因,按品管圈的活动步骤实施各项活动,并拟定和实施改善措施。结果:配制前静脉输液药品缺陷由活动前4周63件减少到活动后4周的3份,达到预计目标值。结论:在病区治疗室开展品管圈活动有效降低了静脉输液药品配制前缺陷率,提高了静脉输液药品质量,保证用药安全。
Objective: To carry out QC activities to reduce the defect rate of intravenous infusion before preparation, improve the quality of work and ensure the safety of medication. Methods: The quality control system was established to analyze the causes of the defects before the formulation of intravenous fluids. The activities were implemented according to the activity steps of the quality control circle, and the improvement measures were drawn up and implemented. Results: The drug defects in preparation of the former intravenous infusion decreased from 63 in the first 4 weeks of the activity to 3 in the 4th week after the activity, reaching the expected target value. Conclusion: Conducting QA activities in the ward treatment room effectively reduces the rate of pre-formulation defects of intravenous infusion drugs, improves the quality of intravenous infusion drugs and ensures the safety of medication.