我们使用的Q384抛丸室在改造以前,设备故障率极高,每班都要维修,经常要连续三班生产才能完成任务,所以清理效率低。另外,铁丸消耗量大,工作条件差,劳动强度也高。针对这些问题,我们对Q384抛丸室进行了全面改造: 1.抛丸器改用Q3025高效抛头,并重新布置设计了新的皮带张紧机构。 2.设计安装了流幕式丸砂分离器,保证了弹丸质量。 3.弹丸由铁丸改为钢丸,从而寿命大大提高。
We use the Q384 shot blasting room before the transformation, the equipment failure rate is extremely high, each class have to be repaired, often three consecutive shifts to complete the task, so clean inefficient. In addition, iron pills consumption, poor working conditions, labor intensity is also high. In response to these issues, we conducted a comprehensive transformation of Q384 shot blasting room: 1. Shot blasting machine to use Q3025 efficient cast head, and rearrange the design of a new belt tensioning mechanism. 2. Design and installation of flow curtain sand separator, to ensure the quality of projectile. 3. Projectile from steel balls into steel balls, which greatly increased life expectancy.