印度的陶利根加工程计划于1999年开始动工,最近已开始了工程的招标设计工作。对坝址条件进行了分析研究;根据这些条件,进行坝体设计,设计研究集中在替代粘土心墙堆石坝的混凝土面板堆石坝上;工程的详细设计与施工还没开始,但已进行施工规划,拟定了关键的施工顺序。
The Tajikeng project in India is scheduled to begin construction in 1999 and has recently started the tender for the project. According to these conditions, the design of the dam body is carried out and the design and research are concentrated on the concrete faced rockfill dam replacing the clay core rockfill dam; the detailed design and construction of the project has not yet started but has been carried out Construction planning, drafting a key construction sequence.