论文部分内容阅读
解决現代的复杂的电力系統的經济工作任务是非常困难的事情。尽管計算电力系統的电站間負載經济分配的計算仪器已經相当精巧(見文献1.3.及5),但是解决这个任务的实际方法仍然是复杂而繁重的。在苏联电子数字計算机直到最近时期仍然沒有应用于这項工作中。国外的文献曾刊載过利用电子数字計算机計算动力系統工作狀态的消息,但是却只限于一般的介紹。本文將叙述应用电子数字计算机計算电力系統中各电站间有功負載的經济分配的具体方法。在計算电力系統电站的有功負載經济分
It is very difficult to solve the economic task of the modern complex power system. Although the computational instruments for calculating the economic distribution of load among power plants in power systems have been quite sophisticated (see References 1.3. And 5), the practical solution to this task is still complex and burdensome. The electronic digital computer in the Soviet Union has not been used in this work until recently. Foreign literature has published the use of electronic digital computer to calculate the working status of the power system news, but it is limited to the general introduction. This article will describe the application of electronic digital computer to calculate the specific method of economic distribution of active load among power plants in power system. In the calculation of power system power station active load economic points