论文部分内容阅读
为彻底解决桥头跳车现象,最近,工程研究人员在宁连一级公路涟水立交支线上跨桥(12+2×20+12)工程中,另辟思路,大胆设想,将桥梁与道路作为一个系统工程来对待。从路沉桥也沉着手,采用不设桥台,悬臂梁端置于可随路基一起下沉的枕梁上,边
In order to completely solve the phenomenon of bridge jumping at the bridgehead, recently, researchers of engineering have given their own ideas to the bridge project (12 + 2 × 20 + 12) on the Lian-Lian Section of Ning-Lian Highway. They boldly assumed that bridges and roads should be taken as A systematic project to treat. From the road Shenqiao also calm hands, the use of not set up abutment, cantilever placed on the subsidence along with the pillow along the edge of the beam, while