论文部分内容阅读
宝鸡石油机械厂铸铁车间3吨冲天炉曾先后采用过人工大杆和手工机械堵铁水眼,都不理想,不仅劳动条件差,事故多,而且堵眼成功率低,浪费铁水。去年十二月份,张忠义等师傅革新成功了如图1所示的气动堵铁水眼装置,实践证明,效果良好,堵成率达100%,炉前操作由三人减至一人。气缸行程250毫米,直径80毫米。所需压缩空气压力应大于2公斤/厘米~2。为防止铁水飞溅,需控制堵杆速度,在手动二位三通换向阀8的排气孔外接一个控制
Baoji Petroleum Machinery Plant cast iron workshop 3 tons of cupola has been used artificial lancet and manual mechanical plug iron eye, are not ideal, not only poor working conditions, accidents and more, and blocking the success rate is low, a waste of hot metal. In December last year, Zhang Zhongyi and other masters successfully renovated the pneumatic plugging water eye device as shown in Figure 1. The practice proved that the effect was good and the blocking rate was 100%. The operation in front of the stove reduced from three to one. Cylinder stroke 250 mm, diameter 80 mm. The required compressed air pressure should be greater than 2 kg / cm ~ 2. In order to prevent the splash of molten iron, it is necessary to control the speed of the plugging rod and add a control to the exhaust port of the manual two-position three-way reversing valve 8