论文部分内容阅读
一日工业厅于七月二十六日至八月一日召开省属地方国营、公私合营厂矿长会议,根据增产节约精神调整了今年年度计划,并确定了各厂矿下半年增产节约具体指针和措施。根据省属六十个厂矿企业的全年增产节约计划,生产方面增产总值六百二十余万元,节约总值二○五万余元,其中原煤将增产六万多吨。基建方面,二十三个单位共节约二一五、九四六元,其中因核减预算而节约的占百分之五四点三三,因降低标准而节约的占百分之四点二八,因降低工程成
The 1st Industrial Hall held a meeting of heads of state-owned and public-private joint ventures held in provincial level from July 26 to August 1, adjusted its annual plan for this year according to the spirit of increasing production and saving and determined specific indicators and measures for boosting output and saving in the second half of each factory and mine . According to the provincial production and saving plan of 60 factories and mines of the province, the total production value of production increased by 6.2 million yuan and the total saving value was 200,000 yuan, of which the output of raw coal would increase by more than 60,000 tons. In respect of infrastructure construction, a total of 23,546 yuan were saved at 23 units, of which 54.33 were saved as a result of the reduction of nuclear load. 4.428% were saved as a result of lowering the standard. , Due to lower engineering into