2014年3月22日,“水电工程移民集中安置区工程地质勘察专题研究”项目通过中国水电工程顾问集团有限公司验收会。验收专家组认真听取了项目承担单位关于课题研究成果和执行情况的汇报,并就研究成果的合理性和准确性进行了认真的讨论和审议,充分肯定了成果结论的实用性和先进性,一致同意该项目通过验收。该项目由中国水利水电建设工程咨询有限公司和中国水电顾问集团华东勘测设计研究院共同承担。项目组通过收集已建,在建水电工程移民安置规划设计成果,在对现有国家、行业规范进行对比、分析的基础上,结合水电移民安置规划设计的要求,全面系统地研究了水电工程移民集中安置区工
On March 22, 2014, the project of “Special Project of Geological Prospecting for Reconstruction of Hydropower Project Resettlement Areas” passed the acceptance meeting of China Hydropower Engineering Consultants Group Co., Ltd. The inspection team listened attentively to the report made by the project undertaking unit on the research results and implementation of the project and seriously discussed and considered the rationality and accuracy of the research results, fully affirmed the practicality and advanced nature of the results and conclusions. Agreed that the project passed the inspection. The project is jointly undertaken by China Water Conservancy and Hydropower Engineering Consulting Co., Ltd. and China East Water Exploration & Design Institute of China Water Power Consultants Group. Based on the comparison and analysis of existing national and industrial codes and the requirements of planning and design of hydropower resettlement, the project team collected the results of resettlement planning and design of existing hydropower projects under construction and resettlement and comprehensively and systematically studied the resettlement of hydropower projects Centralized resettlement district workers