论文部分内容阅读
随着第一轮中外合资乙烯项目在今后两年陆续建成投产,跨国公司现又将注意力转向中国计划在2010年建成投产的下一批乙烯项目.分析人士预测,2005-2010年,中国每年需要新增乙烯生产能力130万-140万吨,乙烯缺口约900万吨. 在确定中国第二轮乙烯项目过程中,陶氏化学、阿托菲纳和阿拉伯基础工业公司等都表现出与中国公司组建合资公司的兴趣.因为按中国政府的要求,要在中国建设乙烯装置的外国公司必须要有地方的合作伙伴.据了解,中石化正研究在镇海、天津、上海和武汉4个地方建设新的乙烯装置;中石油除了要扩大现有子公司的裂解装置外,也在考虑建设
As the first round of Sino-foreign joint ventures in ethylene projects put into operation one after another over the next two years, multinationals are now turning their attention to the next batch of ethylene projects that China plans to put into operation in 2010. Analysts predict that from 2005 to 2010, Need to add ethylene production capacity 1.3 million -1.4 million tons, ethylene gap of about 9 million tons in determining the second round of ethylene in China in the process of Dow Chemical, Atofina and Arab Foundation Industries have shown that with China It is the interest of the company to form a joint venture because foreign companies that want to build ethylene plants in China must have local partners at the request of the Chinese government. It is understood that Sinopec is studying the construction of new facilities in Zhenhai, Tianjin, Shanghai and Wuhan. Of the ethylene plant; PetroChina in addition to expanding the existing subsidiary of the cracker, but also consider building