金华林区为解决春夏木材流送过程中,木排的安全停泊和洪水头冲击时的漂木事故,因地制宜的建造了两种水泥链桩,现介绍如下: 1.大型水泥链桩。是正体式一次浇捣成钢筋混凝土链桩,每只链桩的安全吊排量为一贴大排,计120立方米木材。2.中型水泥链桩。是分级式二次捣成的钢筋混凝土链桩,先预制吊排圆柱体,再浇捣链桩体,每只链桩的安全吊排量为六条小排,计50立方米木材。此两种水泥链桩建造地点,要求选在坚实的黄土层或岩石层。
Jinhua forest area in order to solve the spring and summer wood flow process, the safe mooring of the raft and flooding head flood impact of wooden accidents, according to local conditions to build two kinds of cement chain pile, are as follows: 1. Large cement pile. It is a one-time pouring poured into reinforced concrete chain pile, the safety of each chain pile hanging capacity for a paste large rows of 120 cubic meters of wood. 2 medium-sized cement chain pile. It is a grade two reinforced concrete chain pile, first prefabricated row cylinder, and then pound chain pile body, the safety of each chain pile displacement of six rows, accounting for 50 cubic meters of wood. The construction site of these two types of cement chain pile, requires the selection of a solid loess layer or rock layer.