论文部分内容阅读
通过GHAZI-BAROTHA水电工程首部节制闸水工模型试验,获得了首部节制闸上游水位流量开度关系曲线,并确定了各工况下闸门开度、流量系数及淹没系数,为首部节制闸控制系统提供了闸门优化调度的科学依据。
Through the hydraulic model test of the first control gate of GHAZI-BAROTHA hydropower project, the curve of the opening degree of the water flow in the upstream of the first control gate was obtained and the gate opening, flow coefficient and submergence coefficient of each gate were determined. Provide a scientific basis for optimal gate scheduling.