兖州矿区建设工期短、质量好、达产快、经济效益高,被国家能源部树为典型。其经验是: 1.合理编制规划,充分做好开工前的准备。地质勘探部门提供矿井准确的地质精查报告,设计部门博采国内外矿井设计之长,实现井下采区集中布置,减少井巷工程。2.抓住主要矛盾,运用有效手段组织快速施工。兖州矿区建设在施工部署上,运用统等
Yanzhou mining area construction period is short, good quality, fast production, high economic efficiency, by the National Energy Department tree as a typical. Its experience is: 1. Rational planning, fully prepared to start before the start. Geological exploration department to provide accurate geological report of the mine, the design department mining mining at home and abroad as long as possible to achieve centralized mining underground mining area, reducing the tunnel project. 2. Seize the main contradictions, the use of effective means to organize rapid construction. Yanzhou mining construction in the deployment of construction, the use of such systems