论文部分内容阅读
1988年12月7~9日,由中国核工业供销总公司主持对上海汽轮机厂设计制造的30万千瓦核电汽轮机一号低压缸和高压缸进行出厂验收。参加验收的有关单位的代表共40人。验收是在上海汽轮机厂厂内进行,并组成了验收领导小组。整个验收工作分三个专业组进行。1.产品组:负责对一号低压缸和高压缸的零部件机械加工、组件装配、总装
December 1988 December 9, by the China Nuclear Industry Supply and Marketing Corporation presided over the Shanghai Steam Turbine Factory designed and manufactured 300,000 kilowatts of nuclear power turbine on the 1st low-pressure cylinder and high-pressure cylinder factory acceptance. A total of 40 representatives of the relevant units participating in the inspection. Acceptance is carried out in the Shanghai Steam Turbine Factory, and formed the acceptance of the leading group. Acceptance of the entire work divided into three professional groups. 1. Product Group: Responsible for the machining of parts and components of No.1 low-pressure cylinder and high-pressure cylinder, assembly of assembly, assembly