朝阳电力修造厂为江西省万安水电站设计、制造的SSP_8—120000(kVA)/110(kV)变压器,于1988年2年2月22日一次通过出厂试验。其绝缘水平,性能指标符合GB1094—85.GB311—83及GB6451—86国家标准,部分性能指标达到或超过八十年代初期同类产品的先进水平。万安水电站是江西省最大的水力发电站,为其配套的SSP_8—120000/110升压变压器,使用环境条件、技术条件及各项性能指标要求比较。朝阳电力修造厂精心设计、精心施工,采用新
Chaoyang Power Plant built for the Wan An hydropower station in Jiangxi Province designed and manufactured SSP_8-120000 (kVA) / 110 (kV) transformer, in February 1988 2 February 22 passed the factory test. The insulation level, performance indicators in line with GB1094-85.GB311-83 and GB6451-86 national standards, some of the performance indicators meet or exceed the advanced level of similar products in the early 1980s. Wan’an Hydropower Station is the largest hydroelectric power station in Jiangxi Province. For its supporting SSP_8-120000 / 110 step-up transformer, the environmental conditions, technical conditions and various performance indicators are compared. Chaoyang Power Plant carefully designed, well-constructed, new