三峡升船机贝雷架吊装施工难度大,危险系数高,塔机驾驶作业人员风险认知能力的高低直接关系贝雷架吊装安全。针对贝雷架吊装过程,依据塔机驾驶作业安全技术操作规程,甄选贝雷架吊装的8个代表性危险场景。模糊化处理场景信号值与塔机驾驶作业人员响应值,并通过映射分析构造模糊成员集合,确定命中率和误报率,评测风险认知敏感度和信号响应标准值,定量评估塔机驾驶作业人员风险认知能力。通过3Dmax模拟贝雷架吊装代表性危险场景,对6位塔机驾驶作业人员进行场景试验。结果表明,6人风险认知敏感度位于同一区间,风险认知能力均为中等。编号3,4,5的驾驶作业人员标准值高于优化值,属风险倾向型,需给予针对性培训。
Three Gorges ship lift berett tower hoisting construction of a large degree of difficulty, a high risk factor, tower crane operating risk perception of a direct relationship between the safety of berets hoisting. According to the tower crane lifting process, according to tower crane operating safety technology operating procedures, selection of berehorse lifting of the eight representative dangerous scenes. Fuzzy signal processing scenarios and tower crane operator response value, and through the mapping analysis of fuzzy membership set to determine the hit rate and false positive rate, the sensitivity of risk assessment and signal response evaluation of the standard value of quantitative assessment of tower crane driving operations Personnel risk perception. Representatives of dangerous situations were hoisted by 3Dmax simulated Berets, and scene tests were conducted on six tower crane operators. The results showed that risk-based sensitivities of 6 individuals were in the same interval and their risk cognition was moderate. Number 3,4,5 driving standard value is higher than the optimized value, is a risk-prone type, to be given targeted training.