为力促现有连铸机的正常化生产和尽快达产,遵照部领导指示,于1987年2月24~27日在北京召开八个钢厂(鞍钢二炼钢、天津二钢、马钢二、三炼钢、上钢一厂、邯钢、安钢、涟钢及昆钢)的达产汇报会,同时还邀请了北京钢铁设计院、北京钢铁研究院、设备研究所、机动司及规划院的同志参加了会议。会议采取边汇报、边探讨、边分析的形式进行。一致认为,汇报活动及时,取得了
In order to promote the normalization of the existing continuous caster production and as soon as possible, in accordance with the instructions of the Ministry of leadership, in February 1987 24 to 27 in Beijing held eight steel mills (Anshan Iron and Steel Company II, Tianjin Steel II, , The third steelmaking, the first steel plant, Handan Iron and Steel, Anyang, Lianyuan and Kunming Iron and Steel) production reports, but also invited the Beijing Iron and Steel Design Institute, Beijing Iron and Steel Research Institute, Institute of Equipment, Motor Division and Planning The hospital’s comrades attended the meeting. Meeting to take the edge of the report, while exploring, while analyzing the form. They agreed that the reporting activities were timely and achieved