论文部分内容阅读
苏联亚速钢厂有效地发展高炉渣的综合利用。该厂一九六九年高炉渣利用率90.2%,占全苏平均利用率的63.6%,一九七○年为93.5%,一九七一年开始全部利用高炉渣。一九六九年销售高炉热渣使该厂生铁成本下降13戈比/吨,一九七○年下降14戈比/吨。钢铁设计院规定渣场管理费用至少为30戈比/吨渣。综台利用高炉渣可免去渣场管理费用的开支,亚速钢厂不仅禁止往渣场倒渣,而且逐渐消灭旧有的渣场、用以制造建筑材料并
The Soviet Union speed steel mill to effectively develop comprehensive utilization of blast furnace slag. The blast furnace slag utilization rate of the plant in 1969 was 90.2%, accounting for 63.6% of the average utilization rate of the entire province, 93.5% in 1970, and full utilization of blast furnace slag from 1976. The sale of blast furnace slag in 1969 reduced the pig iron costs by 13 kopecks / tonne in the plant and 14 kopecks / tonne in 1970. Steel Design Institute provides slag yard management costs at least 30 kopec per ton of slag. The comprehensive utilization of blast furnace slag can eliminate the expenses for the management of the slag yard. The steel processing plant in Asia not only forbids the dumping of slag to the slag yard, but also gradually eliminates the existing slag yard for the manufacture of building materials