根据国道107线郴州滑坡处治的工程实例,分析了滑坡产生的原因,介绍了三种处治滑坡的方案,叙述了选定方案——改河反压的主要工程措施.通过竣工后三年多的通车实践,证明改河反压处治措施是成功的.但由于人们对滑坡病害及其破坏性认识不足,在路基右侧大量弃土、计划建房,如果任其下去,必将导致滑体重新滑动,造成更大的灾害.对此提出了建议.
According to the engineering example of Chenzhou Landslide Treatment on State Route 107, the reasons for the landslide are analyzed, and three schemes for landslide control are introduced, and the selected scheme is described - the main engineering measures for the river pressure reversal.After more than three years of completion The opening of the train proved that the treatment measures against the pressure of the river were successful, but due to lack of understanding of the landslide disease and its destructiveness, a large amount of spoil was planned on the right side of the roadbed and plans to build a house would inevitably lead to the renewal of the slide body Slipping and causing more disasters.