论文部分内容阅读
本文依据某火力发电厂贮灰坝的变形监测及物理力学试验资料,对粉煤灰地基上建筑子坝的变形-时间关系、变形幅度、位移方向等问题进行了探讨。并对监测结果反映出坝体向上游水平位移现象在同类坝的监测中作了验证。
Based on the deformation monitoring and physical and mechanical test data of a ash storage dam in a thermal power plant, this paper discusses the deformation-time relationship, deformation amplitude and displacement direction of the building dam on fly ash foundation. And the monitoring results reflect that the upstream displacement of dams has been verified in the monitoring of similar dams.