在三明钢厂白云石车间的扩建工程中有一个27米跨的原料堆场,采用的是预制装配式钢筋混凝土结构,现浇钢筋混凝土料仓。料仓东侧设两座容量为20米~3的白云石焙烧炉,炉子车间采用多层现浇钢筋混凝土框架结构。辅助建筑均采用砖混结构。
In the expansion project of the Sanming Steel Works dolomite workshop, there is a 27-meter-span raw material yard with prefabricated reinforced concrete structures and cast-in-place reinforced concrete silos. There are two dolomite roasters with a capacity of 20 to 3 meters on the east side of the silo. The furnace workshop uses a multi-layer cast-in-place reinforced concrete frame structure. Auxiliary buildings use brick-concrete structure.