地方性水利建设,投资少,见效快,对社会经济发展十分有利。但是,当前有些地方的水利建设存在着一个亟待解决的问题——急于上项目而不按基本建设程序办事。最突出的问题,就是将可行性研究与初步设计硬性压并到一起完成。一些地方政府及所属水利部门,基于本地区的利益,为了向国家有关部、委争取基建投资,在获知一定的信息后,便力争在最短的时间内拿出形式上完整的上报材料。他们一方面通过多方努力使投资意向基本确定;另一方面从国家已完成的本地流域规划中选定目标,或自行决定,让承担项目的勘测设计单位以最快的速度完成设计工作。作为乙方的勘测设计单位,在实行了企业化管理之后,取消了事业费,生产任务又不饱满,
Local water conservancy construction, less investment, quick, social and economic development is very favorable. However, there is an urgent problem to be solved in water conservancy construction in some places at present - eager to go ahead with the project and not follow the capitalist construction procedures. The most prominent issue is to put feasibility studies and preliminary design together to complete the hard pressure. Some local governments and their respective water conservancy departments, based on the interests of the region, strive to obtain investment in infrastructure from the relevant state ministries and commissions and strive to come up with formally completed materials in the shortest possible time after obtaining certain information. On the one hand, they have made concerted efforts to make investment intentions basically determined; on the other hand, they have chosen the targets from the completed plans of the domestic river basins or decided themselves at their own discretion so that the survey and design units undertaking the project can finish the design work as quickly as possible. As a survey and design unit of Party B, after the implementation of the enterprise management, canceled the business costs, production tasks are not full,