大港油田采油一厂在完善先期注水方案的基础上,10年来首次规模实施重型压裂措施。截至2012年6月30日,这个厂对5口井实施了压裂作业,累计增油2 570 t。
On the basis of perfecting the advanced water injection plan, Dagang Oilfield Production Plant No. 1 implemented the first large scale fracturing measures in 10 years. As of June 30, 2012, the plant implemented fracturing operations on 5 wells with a total increase of 2 570 t.