论文部分内容阅读
纽科尔钢公司与EMCI公司签署了一项合同,由EMCI公司向纽科尔公司提供一套钢包冶金设备,安装在纽科尔钢公司的希克曼钢厂,1995年三季度交货。这台钢包冶金设备设计能力为每炉处理钢水165t,使用一台16.0/17.92MVA的变压器提供动力。这台设备包括:EMCI公司的EMARC固态、液
New Cole Steel signed a contract with EMCI to supply Newcastle with a set of ladle metallurgical equipment from EMCI Corporation to Hickman Steel at Newark Steel for delivery in the third quarter of 1995. The ladle metallurgical equipment was designed to handle 165 tons of molten steel per furnace and powered by a 16.0 / 17.92 MVA transformer. This equipment includes: EMCI EMARC solid state, liquid