SST—2型水工模型数据采集装置

来源 :浙江水利科技 | 被引量 : 0次 | 上传用户:xiaoqingxiaoming
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
水工模型试验的基本数据——流速、水位、压力,多年来一直采用毕托管、测针等设备手动目测,读数记录,费时费力,精度也不高。为了满足科研需要,西北水科所试制成功SST—2型水工模型数据采集装置,可满足自动测试要求,经龙羊峡电站模型试验,计数准确,功效提高,整个模型试验只需二人,几分钟即完成一组测试。该装置以巡回检测仪为主,配有时间程序控制器、数字记录器、中央控制系统、流 Hydraulic model tests of the basic data - flow rate, water level, pressure, over the years has been used Biotube, stylus and other equipment manual visualization, reading records, time-consuming and laborious, accuracy is not high. In order to meet the needs of scientific research, the SST-2 hydraulic model data acquisition device successfully trialled by Northwest Institute of Hydraulic Science can meet the requirements of automatic test. With the model test of Longyangxia Power Station, the counting is accurate and the efficiency is improved. Only two persons, A few minutes to complete a set of tests. The device to tour-based detector, with time program controller, digital recorder, the central control system, flow
其他文献
《中华人民共和国水法》颁布实施后,省政府明确了我省各级水利部门是同级政府水的行政主管部门。水利部门的服务方向,从过去主要为农业服务,扩大到对水资源的统一管理和综合
为了让人们更好认识我国南方大河珠江,热爱和支持株江的治理开发事业,珠江水利委员会同广东电视台合作,联合摄制了介绍珠江流域的地理,历史、风土人情,自然风光和水利水电建
印度桑贾伊·维迪乌特·巴里约贾纳水电站的水头为924米,是印度水头最高的水电站。该站装3台水轮机组,每台额定出力为6.3万公制马力,转速500转/分,发电机额定容量为4.6万千
本刊讯按照省委关于在全省开展以“解放思想、改革开放、创新驱动、科学发展”为主题的大讨论活动部署,河北省林业厅自5月上旬起,全面开展“解放思想、改革开放、创新驱动、
山西省汾阳县县委和政府为了全面改革农田水利建设,他们于1984年在政策上、资金补助上作了以下10项规定: (1)凡农民有能力兴办的小型水利工程、人畜吃水工程、小水电站、池
1983年1~3月由于气候异常,华南大部地区普降大雨、暴雨,引起我省局部地区山洪暴发,江河洪峰迭出,很多地方的水位多次接近和超过警戒线,河口的潮汐亦明显增水。在南方,年初即
设计了一种基于FPGA+NIOSⅡ的背照式CCD成像系统。系统采用半导体制冷器对CCD芯片致冷,大幅降低了CCD芯片的暗电流,从而使相机具有很高的灵敏度和很低的读出噪声特性。图像数
部农电司小水电处为了及时贯彻中央关于小水电的方针政策,交流信息、经验和先进技术,开展咨询,直接为基层站点服务,从本期起在本刊辟此专栏。 In order to timely implement
本刊1982年第5期《资料集锦》栏《水源林与水利》一文,因其使用数据出处有误,导致结果与实际有较大的出入,现将《水源林与截雨削洪的能力》一文见刊,互为校正,以明真象。 Jo
水利水电土石坝工程情报网第二次全网大会于1988年11月1日至5日在广西南宁市召开。广西壮族自治区水电厅副总工程师苏注主持了开幕式,水利部黄河水利委员会总工程师王长路致