论文部分内容阅读
芜湖某电厂第二期工程升压站主变压器的事故油池(当变压器检修或发生事故时,作为变压器内的冷却用油排放出的储存池,故称事故油池) 为地下式圆形钢筋混凝土结构,池底垫层标高为-4.5m(升压站自然地坪为±0.00m),池顶约有2m的覆土,以保证油池的安全。该池的施工方法与一般相同,全池的底板、池壁和盖板共有钢筋混凝土19.5m~3,分两次浇注,施工缝设在底板和池壁之间,
The accidental oil pool of the main transformer of the booster station of the second phase of a power plant in Wuhu (when the transformer is overhauled or an accident happens, it is used as a storage tank discharged from the cooling oil inside the transformer, so it is called an accidental oil pool) as underground circular steel bar For concrete structures, the elevation of the bottom cushion of the pool is -4.5m (±0.00m for the natural floor of the booster station), and the top of the pool is about 2m of earth covering to ensure the safety of the oil pool. The construction method of the pool is the same as the general method. The floor, wall and cover of the whole pool have a total of 19.5m~3 reinforced concrete, which is poured in two times. The construction joints are arranged between the bottom plate and the pool wall.