论文部分内容阅读
吐鲁番地区石榴冬季修剪时间一般为春季开墩后3月20日至萌芽前4月20日,秋季落叶至埋土前。树形采用多主干灌丛状,树高控制在2.5m左右。1幼树整形修剪定植后1~2年以自然生长为主,第2年可产生一部分根蘖,注意从中选择4~7个进行主枝培养,多余的根蘖全部从基部疏除。第3年再从根蘖中选择2~5个进行培养,使主枝达到7~11个。幼树主侧枝的培养应根据枝条生长强弱和着生位置进行短截。延长枝剪留40~50cm,侧生枝短些,内膛各级枝上的小枝,
Turpan winter pomegranate pruning time is generally open in spring after March 20 to the bud before April 20, autumn leaves before the landfill. Multi-trunk tree shrub shape, tree height control in about 2.5m. 1 saplings pruning 1 to 2 years after colonization of natural growth-based, can produce some of the second year of root tillers, pay attention to choose from 4 to 7 of the main branch of culture, the excess of all of the root tillering from the base. In the third year and then from root tillers to choose 2 to 5 to cultivate, so that the main branch to reach 7 to 11. Saplings of the main branch of the cultivation should be based on the growth of branches and the position of a short cut. Prolong the branches to stay 40 ~ 50cm, side branches shorter, at the inner branches of branches at all levels,