一、概述本设计是石油部第二炼油设计研究院进行编制的。低温电站外热水管网及厂前区采暖由长岭炼油厂设计室设计。工程规模按催化裂化装置年处理量100万吨和焦化装置年处理量45万吨所供出的低温热量配套设计,但也考虑到催化裂化装置年处理量120万吨供出热量时的可能性。低温热源分别来自催化裂化装置和焦化装置(参见图1)。催化裂化装置具有可利用的低温热为3280.35万千卡/时,这次改造后能够利用
First, an overview of the design of the Ministry of Petroleum Refinery Design Institute for the preparation of the second. Low temperature hot water pipe network outside the plant and the front of the heating plant by Changling refinery design room design. The scale of the project is designed according to the low temperature calorific value provided by the annual processing capacity of 1 million tons of catalytic cracking unit and 450,000 tons of coking unit. However, it is also considered that the annual capacity of 1.2 million tons of catalytic cracking unit can be used for heat generation. Low-temperature heat sources come from the catalytic cracking unit and coking unit, respectively (see Figure 1). The catalytic cracking unit has an available low-temperature heat of 32,803,500 kcal / h, which can be utilized after this modification