1 前言我们西林钢铁公司第二炼钢厂现有公称容量10吨的电炉三座,公称容量20吨的电炉两座。95年6月又新建成、投产小方坯连铸。由于当时连铸在二炼钢厂属于新工艺,指挥和操作人员经验不足,加之小电炉配连铸,组织难度大;以致生产初期,原材料消耗相当大,未能充分发挥出连铸的优势。针对这种情况,我们采取了一系列措施,加大降耗管理力度。进入97年,各项技经指标均有大幅度好转。到97年6月份为止,连铸实际生产 17个月,累计生产铸坯 16.40万吨;连铸比由95年的29,04%提高到97年的89.47%;漏钢率由95年的3二1%下降到97年的1.35%;平均连烧炉数为4* 炉/次,最高连浇为12炉j次;并且在97年5月份的生产中,连铸机达产并超过设计产量12500吨,共生产连铸
1 Foreword The second steel mill of Xilin Iron and Steel Company has three existing electric furnaces with a nominal capacity of 10 tons and two electric furnaces with a nominal capacity of 20 tons. June 95 was newly built and put into operation billet continuous casting. Because at the time of continuous casting in the second steelworks belong to the new technology, lack of command and operator experience, combined with small electric furnace with continuous casting, organizational difficulty; resulting in the production of raw materials consumption is quite large, failed to give full play to the advantages of continuous casting. In response to this situation, we have taken a series of measures to increase consumption management efforts. Into 97 years, various technical indicators have improved significantly. As of June 1997, the actual production of continuous casting was 17 months, with a cumulative production of 164,000 tons of slab; the continuous casting ratio increased from 29,04% in 1995 to 89.47% in 1997; the steel leakage rate increased from 3 in 1995 Two percent down to 1.35% in 1997; the average number of continuous furnaces was 4 * furnaces per second with a maximum of 12 continuous furnaces and j times; and in May 1997, the continuous caster produced and exceeded design Production of 12,500 tons, a total production of continuous casting