论文部分内容阅读
上海市机械施工公司承担了上海地铁一号线人民广场到新闸路区间的隧道施工任务,所采用的盾构为法国FCB工程公司制造的90年代先进的土压平衡式盾构,在机械和电气方面都比较先进。使用和掌握好盾构的性能,对隧道的施工质量影响很大,而保养好盾构,使其不损坏和少损坏,对隧道的施工进度也是非常关键的。为此,要想顺利的完成隧道的施工任务,就必须首先研究和吃透施工中的主要设备
Shanghai Construction Machinery Co., Ltd. undertook the construction of the tunnel between People’s Square and Xinzha Road in Shanghai Metro Line 1 and adopted the advanced earth pressure balance shield manufactured by FCB Engineering Company of France in the mechanical and Electrical are more advanced. The use and mastery of the performance of the shield has a great influence on the construction quality of the tunnel, and the maintenance of the shield does not damage or damage less, and the construction progress of the tunnel is also very crucial. To this end, in order to successfully complete the construction of the tunnel task, we must first study and thoroughly through the construction of major equipment