胜利油田埕北 2 1-平 1井是 1口重点科研试验井 ,也是国内陆上油田第 1口水平位移突破 30 0 0 m的大位移水平井。实际完钻井深 4837.4m,垂深 2 6 33.91m,水平位移 316 7.33m,造斜点位置 10 0 0 m,最大井斜 93.6°,水平段长 10 0 m,最大狗腿度 41.6°。介绍了固井中存在的技术难点 ,以及固井设计和施工过程中所采取的措施 ,包括套管摩阻分析计算 ,全钢旋流扶正器和单向回压阀等工具的研制 ,水泥浆体系的优选和现场固井工艺过程 ,为今后同类型井提供了借鉴经验。
Pingbei 2 1-Ping 1 well of Shengli Oilfield is a key scientific research pilot well and also a large displacement horizontal well whose level displacement of No. 1 port of onshore oil field has exceeded 30 000 meters. The actual drilling depth is 4837.4m, the depth is 26.39m, the horizontal displacement is 316 7.33m, the place for whipping point is 10 0 m, the maximum deviation is 93.6 °, the horizontal length is 10 0 m and the maximum dogleg is 41.6 °. The technical difficulties in cementing and the measures taken during cementing design and construction are introduced, including the analysis of casing friction analysis, the development of all-steel cyclone centralizer and one-way back pressure valve, the development of cement slurry system The optimization and on-site cementing process provide reference experience for the same type of well in the future.