昭平台水库二级水电站属干渠引水式电站,通过水资源分析,目前不能完全利用干渠水资源,水资源浪费严重,通过对设计流量计算和设计水头计算,对二级水电站2号机组增容改造是非常必要也是完全可行的。
The Zhaopingtai Reservoir Hydropower Station II is a diversion power station. Through the analysis of water resources, the water resources of the main canal can not be fully utilized and the water resources are seriously wasted. By calculating the design flow and designing the head design, It is very necessary and completely feasible.