论文部分内容阅读
7月20日,国网直流建设部在国网山东电科院组织召开了调相机机务安装、电气及仪表与控制系统施工质量验收标准讨论会。国网直流建设部王庆处长出席会议并讲话,江苏电力公司、湖南电力公司、山东电科院、河北电建等单位参会。会上,国网山东电科院详细汇报了《调相机工程施工质量验收规程》(机务安装工程、电气工程、仪表与控制系统部分)的编写审核情况,各单位专家对规程各部分的验收项目划分、强制条文引用、标
On July 20th, State Grid’s DC Construction Department held a seminar on the installation and adjustment of the installation quality of the camera, electrical and instrumentation and control systems at the State Grid Shandong Electric Power Research Institute. Director Wang Qing of the DC Construction Department of State Grid attended the meeting and delivered speeches. Jiangsu Power Company, Hunan Power Company, Shandong Institute of Electric Power and Hebei Electric Power Construction attended the meeting. At the meeting, the State Grid Shandong Electric Power Research Institute reported in detail the preparation and review of the Regulations for Acceptance of Camera Construction Quality (Engineering Installation Engineering, Electrical Engineering, Instrumentation and Control Systems), and the inspection and acceptance of various parts of the regulations by experts of all units. Division, mandatory articles, and standards