论文部分内容阅读
在滹沱河特大桥主拱肋竖向转体过程中,对各个结构的重点部位进行了施工现场监控,为竖向转体施工提供精确、科学的参数,从而确保了主拱肋竖向转体的安全。
During the vertical swiveling of the main arch rib of the Hutuohe Grand Bridge, construction site monitoring was carried out on the key parts of each structure to provide accurate and scientific parameters for vertical swivel construction so as to ensure that the vertical rotation of the main arch rib Security.