光面爆破是新奥法施工中保护围岩、提高围岩承载力的三大要素之一,但当软弱围岩节理裂隙发育时光面爆破难以达到规范规定的理想效果,且易引发围岩局部坍塌等安全问题。为此,依托实际工程探讨了联合采用隧道轮廓机械铣挖和核心土爆破综合掘进工法的可行性、施工工序及主要施工控制参数。该工法充分发挥了钻爆法快速和铣挖法围岩扰动小的优势,达到了软弱围岩地层隧道安全、快速施工的目的。
Smooth blasting is one of the three major factors that protect the surrounding rock in the construction of the new Austrian law and improve the bearing capacity of the surrounding rock. However, it is difficult for the smooth blasting to reach the ideal effect specified in the normative provisions when the fractured and fractured rock is developing. Collapse and other security issues. Therefore, relying on the actual project, the feasibility of jointly adopting the tunnel profile mechanical milling and core soil blasting comprehensive excavation method, the construction process and the main construction control parameters are discussed. The method gives full play to the drilling and blasting method and milling excavated surrounding rock disturbance small advantage, to achieve a soft rock tunnel strata safety, rapid construction purposes.