论文部分内容阅读
合钢二厂烧结车间的原料设施包括:三跨中和料场(第三跨待建),各跨跨距均为31.5米,第一、二跨的长度分别为270米和279米,每跨安装有两台持续作业率为25%、起重量为10吨、抓斗容积为2.5米~3的桥式抓
The raw materials and facilities of the steelmaking plant of Sinosteel II include the three-span neutralization yard (third cross-docking) with a span of 31.5 meters and a length of 270 meters and 279 meters respectively Across the installation of two continuous operation rate of 25%, lifting capacity of 10 tons, grab volume of 2.5 meters to 3 bridge grab