富春江水电站是在1958年大跃进的形势下上马的,机械设备和材料都不足,但全体职工在困难的条件下,艰苦奋斗,取得了巨大的成绩。一年以来,开展了以技术革新和技术革命为中心的增产节约运动;发动职工破除迷信,树立自立更生的思想;动脑筋想办法,合理地修改设计。研究制定比较先进的施工技术措施。为国家节约了钢材四千吨,水泥两千多吨,木材一万多方。实现了几个重大的革新项目。
Fuchunjiang Hydropower Station was launched in 1958 under the situation of the Great Leap Forward with insufficient machinery and equipment and materials. However, all staff and workers worked hard under difficult conditions and made great achievements. Since the beginning of the year, a campaign to increase production and save with technological innovations and technological revolution as the center has been launched. Staff members have been mobilized to break the superstition and establish a concept of self-reliance. They have taken the time to think of ways to make rational changes to their designs. Study and formulate more advanced construction technology and measures. For the country saved 4,000 tons of steel, more than 2,000 tons of cement, timber more than 10,000 square. Achieved several major renovation projects.