论文部分内容阅读
本文运用模糊(Fuzzy)数学理论,对工程施工方案进行多种子因素集合和模糊关系矩阵分析,得出诸方案的综合评价,以进行施工方案的定量优化抉择。
In this paper, fuzzy mathematics theory is used to carry out a multi-factor set and fuzzy relation matrix analysis of the construction scheme, and the comprehensive evaluation of the schemes is obtained to carry out the quantitative optimization of the construction scheme.