WinterConstructionontheTurbineFoundationattheFloorabove6m十里泉电厂四期扩建工程安装2台300MW机组。7号基础6m以下部分的梁、柱于1995年11月竣工。当(6—12.525)m层钢筋绑好,支好模板时,已到了1996年的元月份,气温一般都在(一2—一8)t。在这样的气候条件下,既要
WinterConstructiononTheTurbineFoundationattheFloorabove6m Shiliquan Power Plant Phase IV expansion project installed two 300MW units. The beams and columns below the 7m foundation were completed in November 1995. When the (6-12.525) m-layer steel bars were tied up and supported the template, it was already in January of 1996, and the temperature was generally (1-2-8)t. In such climate conditions, both