金家岩隧道新奥法施工试验成功

来源 :铁道标准设计通讯 | 被引量 : 0次 | 上传用户:papalong2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1980年10月至1982年10月,在成渝铁路电气化改造中新建的金家岩双线隧道进行了软弱围岩新奥法施工科研试验。试验内容有光面爆破、喷锚支护、复合式衬砌、结构防水、地质调查与声波测试等5个项目。目前除复合式衬砌受力状态还需继续观测外,其余试验工作已全部结束。为了检阅科研试验成果,由成都铁路局工程处、铁科院西南所和铁二院科研所共同主持,于4月中旬在成都举行了金家岩隧道科研试验技术总结会。 From October 1980 to October 1982, the new Austrian Arc Method construction of soft surrounding rock was conducted in the Jinjiyan double-track tunnel newly built in the electrification of Cheng-Yu Railway. The test contents include smooth blasting, shotcrete and anchor support, composite lining, waterproof structure, geological survey and sound wave test. At present, in addition to the composite lining also need to continue to observe the state of stress, the rest of the test work has been completed. In order to review the results of scientific research and experiments, Chengdu Railway Bureau Agency, Southwest Branch of Iron ASTRI and the Second Institute of Iron and Steel Research Institute co-chaired by the Central Plains in mid-April held a Jin Jiyan tunnel technology research and experiment summary.
其他文献
对真空预压法加固新近吹填淤泥地基工程中是否铺设砂垫层进行现场试验研究,对比分析了不同区块的地表沉降、真空度、孔隙水压力及十字板试验抗剪强度.试验结果表明,对吹填淤
扬子石化—巴斯夫有限责任公司二期改造项目中心灌装站D521为一轻钢结构建筑,基础采用独立基础.场地地质条件为在平均厚度2m左右的浅层持力层位新近沉积粉土,6年前在上面吹填
会议
亨利·凯尔纳(Henry Koerner)曾经说过:“我有一个非常幸福的童年,痛苦来得很晚。”1915年,他生于奥地利维也纳的一个中产阶级犹太家庭,父亲是一个有才能的业余制图员。他的
结合广东科学中心饱和软土地基处理的工程实例,通过对多种地基处理方法的综合比较分析,选择了最优的软基处理方案——动静结合排水固结法处理软土地基,在进行现场试验的基础
结合某软基处理工程实例,阐述了现场工程地质条件及地基处理施工工艺,分析了在真空预压下地表沉降的现场监测结果,并利用有限元软件MIDAS/GTS建立了真空预压二维有限元模型,
前言木质注浆机是我厂注浆工人江达友同志和木工冯宗银等同志的紧密配合下。为积极响应党底号召——实现琢器注浆化的前提下.大胆地发挥了四敢风格而试制的。经过一个半月的
近几年来,大型防波堤在风暴中一再发生大片护面层被海浪席卷而去的事故。问题在于,导致事故的风暴未曾达到根据模型试验本应能够耐受的等级。这种现象可用护面层液化来解释
填海造地软基处理工程以其处理面积大、地质条件复杂,处理后地基不均匀沉降较难消除,给常规地基处理方法带来了极大的挑战.塑料排水板—堆载预压法是软基处理工程中较为经济
会议
有些准妈妈在妊娠反应的影响下,食欲减退,变得偏爱咸、辣等重口味的饮食。殊不知小小的调味品也会给身体带来严重的健康问题。那么准妈妈在孕期应该怎么吃盐呢? Some expect
排水固结法被广泛用于广东省公路软基处理.基于多年的工程实践,对公路排水固结法的排水垫层宽度、路堤稳定分析、地基沉降计算等事项进行了讨论和分析.建议排水垫层宽度应考