论文部分内容阅读
介绍大桥电厂自投运以来,发电机组灭磁装置所存在的问题,提出了改造方案, 对装置改造中安装调试过程作了较详细的阐述。
This paper introduces the problems existing in the demagnetizing device of the generator set since it was put into operation in Daqiao Power Plant, and proposes a modification plan to explain the installation and commissioning process in the process of device modification.