In Vitro Anti-tumor Immune Response Induced by Dendritic Cells Transfected with Recombinant Adenovir

来源 :华中科技大学学报(医学英德文版) | 被引量 : 0次 | 上传用户:hellojie
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The specific anti-tumor immune response induced by mouse bone marrow dendritic cells (DCs) transfected with recombinant adenovirus carrying mutant k-ras genes was investigated. DCs were generated from mouse bone marrow in the presence of rmGM-CSF (3.3 ng/mL) and rmIL-4 (1.3 ng/mL) and detected by FACS, and then transfected with the recombinant adenovirus encoding mutant k-ras gene. The efficacy of transfection and T cell stimulating activity of DCs were detected. CTL activity of the mice vaccinated with DCs was observed. The results showed that DCs had dendritic veiled morphology. BmDCs highly expressed B7-1 (80 %), B7-2 (77 %), MHC Ⅱ (70 %), CD11c (65 %), CD40 (70 %) and CD54 (96 %) with FACS, and no significant difference in the expression was observed before and after the transfection (P>0.05). The DCs transfected by mutant k-ras gene could significantly stimulate lymphocytes proliferation as compared with those transfected by Ad-c or non-modified DCs (P<0.05). DC vaccine transfected by mutant k-ras gene could induce CTL activity against Lewis lung cancer, but not against B16. The specific cytotoxicity against Lewis lung cancer in Ad-k-ras/12-transduced DC group was significantly higher than those in the control, vector and non-transfected DCs groups (P<0.05). It was concluded that special antitumor response could be induced by DCs transfected with recombinant adenovirus carrying mutant k-ras genes.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
根据锅炉压力容器安全监察局(以下简称“锅炉局”)“关于对压力容器制造单位质量保证工程师进行培训、考核工作的通知”(以下简称“3019号文”),中国化工装备协会(以下简称“
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
作为安防专业展会,安博会上展出的“千里眼”、“顺风耳”让人大开眼界。作为领先的安防产品供应商和解决方案提供商,千目聚云数码科技(上海)有限公司携领先的解决方案亮相本
随着我国电网规模的不断增大,变电运行工作面临着工作任务重和技术要求高的特点,这就对变电运行维护提出了更高的要求.所以,在当前的社会发展趋势下,采取何种方式来处理好变
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥