论文部分内容阅读
随着我国工业生产的迅猛发展,各标准件厂的广大革命职工除了“自力更生”地迅速创制新设备外,还对一些生产效率低、劳动强度大的老设备进行了改造,并收到了显著的效果。天津标准件厂以老工人为主体的“三结合”小组,对苏修A121型双击整模自动冷镦机进行了改装。按苏修的原设计,这台设备的生产率应为110件/分,但实际只能达到80~90件/分。“三结合”小组经过
With the rapid development of industrial production in our country, the vast majority of revolutionary workers in various standard parts factories not only quickly created new equipment with “self-reliance,” but also reformed some old equipment with low productivity and labor intensity and received significant effect. Tianjin Standard Parts Factory to the old workers as the main “triple combination” group, the Soviet revision A121-type double-die automatic cold heading machine was modified. According to the original design of the Soviet revisionist, the production rate of this equipment should be 110 pieces / minute, but actually it can only reach 80-90 pieces / minute. “Three combined” group passed