论文部分内容阅读
介绍武广铁路客运专线建设中通信、信号、电力、接触网等站后四电专业在路基、桥梁、隧道工程中的综合接地接口预留方案,探讨客运专线综合接地技术的具体实践,结合武广客运专线目前综合接地工程实际,提出了接地方案的施工质量控制要点。
This paper introduces the plan of comprehensive ground connection in the subgrade, bridge and tunnel construction of communication, signal, electric power, catenary and other stations in the construction of Wuhan-Guangzhou Railway Passenger Dedicated Line, discusses the concrete practice of integrated grounding technology of passenger dedicated line, The current comprehensive grounding project of Guangzhou-Guangzhou Passenger Dedicated Line puts forward the construction quality control points of the grounding scheme.