论文部分内容阅读
1.Introduction In recent years,a large number of geotechnical engineering projects have been completed or under construction in China,such as the Three Gorges Dam Project,Expressway Network Plan,South-toNorth Water Diversion Project,West-to-East Gas Pipeline Project,etc.(Wang,2003;Li,2010;Huang,2011;She and Lin,2014).The construction of large-scale geotechnical engineering not only brings huge economic benefits,but also causes large interference to the lithosphere and hydrosphere that we rely on for survival(Wang et al.,2005).This paper focuses on the interaction mecha-
1. Introduction In recent years, a large number of geotechnical engineering projects have been completed or under construction in China, such as the Three Gorges Dam Project, Expressway Network Plan, South-to-North Water Diversion Project, West-to-East Gas Pipeline Project , the construction of large-scale geotechnical engineering not only brings huge economic benefits but also causes large interference to the lithosphere and hydrosphere that we rely on for survival (Wang et al., 2005). This paper focuses on the interaction mecha-