论文部分内容阅读
卡鲁阿奇工程发电机组的主要合同已于1993年年底签订,机组将在2001年开始商业运行。介绍卡普兰式水轮机的设计(包括CFD和水力模型研究)以及发电机的特殊性能。
The main contract of Kaluqi Engineered Genset was signed at the end of 1993 and the unit will begin commercial operation in 2001. Introducing Kaplan turbine design (including CFD and hydraulic model studies) and generator special features.