里石门水库的拦河坝为双曲拱坝,坝高74.3米,坝长265.5米,底宽15.5米,顶宽4米,用横缝将坝体分为21个坝段,沿坝高分成8个灌浆层共110个灌区。为保证坝体形成整体结构,对横缝必须进行封拱灌浆。为此,坝体要进行冷却,使横缝张开度达到最大值,以利于按期封拱灌浆。坝体采用两期冷却,埋管冷却是降温的主要措施。为了降低混凝土入仓温度,采取骨料搭凉棚、洒凉水、料仓底部取料,以及夏天高温时用冰水(约4℃)拌和等辅助措施。
The dam of Lishimen Reservoir is a hyperbolic arch dam with a height of 74.3 meters, a length of 265.5 meters, a bottom width of 15.5 meters and a top width of 4 meters. The dam body is divided into 21 sections by transverse joints and divided into 8 sections A total of 110 grouting irrigation area. In order to ensure the dam body to form the whole structure, the transverse seam must be closed arch grouting. To this end, the dam to be cooled, so that the maximum horizontal joint opening to facilitate the closure of arch grouting on schedule. Dam using two cooling, buried cooling is the main measure of cooling. In order to reduce the temperature of concrete warehousing, take the aggregate to take the pergola, sprinkle cold water, silos at the bottom of the material, and summer high temperature with ice water (about 4 ℃) and other auxiliary measures.