我国的海外矿山建设大多投资于不发达的国家或地区,一般有着工期紧、工程所在地物资供应匮乏、施工条件复杂、地理空间跨度大等特点。所以,对于海外矿山建设期的投资成本控制,从项目的一开始就应从思想上和认识上予以高度重视,并充分考虑项目所在国的运输能力、物资和劳动力供应、水电气及交通状况、政府审批程序等客观条件,在投资建设的各个时期、各个环节都要因地制宜进行成本控制。本文谈谈海外矿山建设期投资成本控制的关键点。一、做好设计方案审核,坚持开工前图纸会审和优化制度海外矿山建设期成本控制的重点在于初期的投资决策和设计决策,所以首先在最终设计确定之前,要根据当地的市场环境和现场施工条件对图纸和工艺方案进行全方位的审查和
Most of our country’s overseas mining construction invests in underdeveloped countries or regions. Generally, it has the characteristics of tight construction period, lack of supplies of materials, complex construction conditions and large geographical space. Therefore, for the overseas construction cost control of mines, we should attach great importance to ideology and cognition from the very beginning of the project and give full consideration to the transportation capacity, supplies and labor supply, hydropower and traffic conditions in the host countries, the government Approval procedures and other objective conditions, in all stages of investment and construction, all aspects of the cost control should be based on local conditions. This article talks about the key points of investment cost control in overseas mine construction period. First, to do a good job in the design review, adhere to the pre-commencement plans for the trial and optimize the system Overseas mine construction cost control focuses on the initial investment decisions and design decisions, so first of all, before the final design is determined, according to the local market environment and on-site construction Conditions of drawings and process plan for a full range of review and