论文部分内容阅读
罗河大桥双薄壁高墩中系梁施工时,对于采用满堂支架法施工与翻模模板焊接牛腿支架法施工,从施工进度与经济方面进行了对比,以优化施工设计方案及工艺。
For the construction of double-walled high pier in Luohe bridge, it is necessary to compare the construction progress with the economic aspects in construction of the middle-beam with double-walled high pier and the method of welding the cow leg support with the full support method and the flip mold to optimize the construction design and process.